obot session hub · session report

Session 2026-07-23 · obot2

● LiveReport generated 8:58 AM
Priorities0 open · 0 donescratchpad kickoff list
Agents21 done · 1 blocked
Tokens1487.6kacross 2 reporting sessions
Closure00 merged · 0 closed · 0 released

Accomplishments

derived: releases + requirement issues + closures since session start

no releases, requirement moves, or closures yet this session

Priorities

scratchpad · ## Overview — click a row for detail

Roadmap activity

5 events · gh sweep, all events
safety.vizPR #101 participant-profile: shared drill-down module — standalone renderer + dock, hep-explorer adopts first — opened
safety.vizPR #102 participant-profile rollout batch 1: outlier-explorer, shift-plot, delta-delta adopt the dock (#99) — opened
safety.viz#99 participant-profile: lab-family dock rollout — histogram, outlier-explorer, shift-plot, results-over-time, qt-explorer, delta-delta — updated
obot.agentPR #41 Requirements: participant-profile PPRF matrix (27 rows, sv#98) + HEP-ARM-001 TRTA fix — opened
safety.vizPR #103 participant-profile rollout batch 2: histogram + qt-explorer adopt the dock (#99) — opened

Agents

state.json + claude agents — P# links to the priority
safety-viz patient drill-downdone
participant-profile ultracode complete — draft PR stack sv#100→103 + oa#41 shipped, all gates green; composite drill-down gap closed across six renderers, awaiting Jeremy's stacked review
10:04 PM–3:34 AM (5h 30m) 1273.0k tok fable
lead?blocked
continue
10:44 PM–8:57 AM (10h 12m) 214.7k tok
😺🤖 2026-07-22 2

Notes

0 · scratchpad · ## Notes

⚠ no ## Notes section in today’s scratchpad

Scaffold

0 · scratchpad · ## Scaffold

⚠ no ## Scaffold section yet — capture with "scaffold: …"

Next session

memory + last diary
Written at the end of the 2026-07-22 late session (session #2, job 45021083 — #18 design approved live + implementation shipped overnight per Jeremy's sign-off; wrapup COMPLETED 07-23 morning: diary 2026-07-22-2 posted, #28→Released, release notes patched, #43/sv#98/sv#99 board-staged, sv#100 Closes-line fixed, tip CI re-run, sv#104 filed). Supersedes the 07-22 wrapup list. MORNING REVIEW (Jeremy first): 1. oa PR#40 — the --auto core (skills, goals/, obot-auto, autonomy-grants.json A1, merge-policy + gsm.safety). In the policy-file carve-out → his approval to merge (mark ready, then obot-merge or directed). Design record: #18 doc (APPROVED badge, all decisions in §5/§11). 2. Maiden A1 run (after #40 merges, he triggers): obot.agent/scripts/obot-auto --increment jwildfire/safety.viz#85 — or --preflight-only first for a zero-cost check. 3. Close clicks (agent closes still permission-blocked): gs#44 (branch model done+verified), hub#41, open-but-Released #2/#3/#21/#30. Also the participant-profile merge train: oa#41 first, then sv#100→#103 once tip CI green (re-runs 29986442156/29988563324 triggered at wrapup); en-route decisions: stale hep-core-split branch delete, proof-file location, SSP-API-003 rewording. NOTE: the #18 closes-grant (all-but-Requirements) isn't wired into the permission scaffold yet — wiring it is a scaffold change for a reviewed session. THEN (carried, re-prioritized): 4. gs v1.0.0 follow-through#28 board → Released, release-notes Requirements delivered: check, Diary #8 = the v1.0 ship story outline (hub#22); v1.0.0 shipped 07-22 ~22:00 EDT (release). 5. Keynote-plan report (#10) — stage model → plan of record; Stage-3 kickoff (#18) is now real material. 6. open.gismo plan rewrite app-first (#34); prereq admin: obotclaw install on open.gismo (also gates G2 --auto increments per goals/app.md). 7. Release skill (oa#36) — now includes the requirement-closes-on-release-PR step (07-22 decision). Queued: hub#45 ⚡️ launch call (sv#98/#99, D1–D5 locked) · hub#44 status page (gsm.safety DEV STATUS heals next deploy; 3 repos still lack dev) · oa#37 obot-merge hardening · hub PR#42 review + #9 D1–D4 · nep #35 · board hygiene (hub#43 not on board; sv#83–89 + oa#32/#36/#37 untracked) · qt resolvePlaceboArm FILED as sv#104 · rollup lane (AFTER --auto ships, O6). Carried admin: obotclaw install jwildfire.github.io; Gilead PR#151; hub #3 §7; LinkedIn; deletions approval.
last diary (2026-07-22.md)
1. gs PR #39 merge + tag v1.0.0 (hub #28, now in Review) — everything is green and current; this is the Stage-2 headline act. gsm.safety is manual-lane by policy, so the merge is @jwildfire's (or --jeremy-approved directed).
2. Keynote-plan report on the hub (hub #10) — write the decided stage model down as the plan of record.
3. Autonomy design--auto /session-init + /goal for hub #18's Design section.
4. open.gismo plan rewrite, app-first (hub #34) → Phase 1–4 requirements. Prereq admin: obotclaw app install on open.gismo before its first agent merge.
5. release skill for obot (oa#36) — codify the request-driven train the v1.4.1 run just walked: pre-flight → obot-merge → promote → tag → release notes with Requirements delivered: → evidence/extracts refresh. Absorbs the queued safety.viz-release skill; today's transcript is the template.
6. Status-page follow-up (hub #44): unreleased-commits-on-main view; dev-branch policy for the four repos showing "Unavailable".
7. Carried: hub PR #42 review + D1–D4 on #9; nep #35 pre-flight → ⚡️; Diary #8 (hub #22); board hygiene G1/G5; obot-merge hardening (oa#37).
frozen operational record · pairs with diary/2026-07-23.md · boundary: no marker → local midnight (12:00 AM) · session-hub (obot.agent v0.2 · #24)