npm run requirements regen on sv dev (nothing logged) → carried. Maiden-run review incl. the flagged AXIS-5 deviation callDelta notes (08:57): NEW since 08:55 hand-off = hub#61 + hub#64 · promoted ideas' titles confirmed: #53 = Goal pages, #57 = homepage refactor (they ARE focus ① and ③) · board-stage query capped at --limit 80, stages unfetched for hub#35–64 / sv#54–104 / gs#44.
⚠ no ## Notes section in today’s scratchpad
gh project item-list --limit 80 now caps out (board >80 items) — stages silently unfetched for high-numbered issues; bump the skill's documented limit to ~200 (2026-07-24 session 3)npm run requirements regen on safety.viz dev — the post-oa#43 tail step nothing logged (train merged 07-24 13:02Z).
7. safety.viz queue: sv#109 fixture rot (filed at wrapup) · sv#104 qt placebo-arm fix · sv#99 dock rollout · sv#87 selector rot follow-on · at next release promotion close sv#53/#91/#98 (hub#45).
8. hub#64 matrix-relocation requirement (boarded at wrapup: Req Gathering, backlog).
9. Carried: Diary #8 outline (hub#22) · keynote report #10 · og #34 app-first rewrite · release skill oa#36 · obot-merge hardening oa#37 · status page hub#44 (re-scoped gh.dash-only) · scaffold: session-init delta gh project item-list limit 80 → 200 (small oa PR).
Related: [[goals-as-issues]], [[idea-queue-workstream]], [[remote-control-framework]], [[model-allocation-grant]], [[hub-18-autonomy-design]].--auto wrapup canon) (#46/#48/#18).obot-auto --increment jwildfire/safety.viz#85 (--preflight-only free) (#18).