The documentation-site lane closes its build phase: @jwildfire merged the
evidence-pipeline and API-reference PRs in the morning, and by afternoon the site build
itself (#7) was up as a draft PR โ the first PR authored end-to-end by the obotclaw app
under a new identity rule set today. The hub also gained a full set of session-lifecycle
skills (kickoff, mid-session capture, wrapup), of which this entry is the first product.
Work completed
Morning: maintenance sweep + PRs #9/#10 merged
Safe maintenance (recon session): milestone
v0.1.0 created in safety.viz
with all ten issues/PRs assigned; PR #9 Development-linked to #5; blog draft PR #8
(jwildfire.github.io) body now references hub
#22; local safety.viz/dev
fast-forwarded and the .github (gsm.agent) clone pulled to v0.2.0.
dev became safety.viz's default branch (@jwildfire's call) โ Closes #X now
resolves against dev, so sub-issues auto-close when feature PRs merge.
PR #9 (evidence pipeline) and
PR #10 (API reference) merged to
dev by @jwildfire, clearing 07-08 loose end #1.
safety.viz#5 and
#6 closed (manually โ auto-close
raced the default-branch switch). Board: both Released (moved at wrapup).
Afternoon: site build (#7) โ draft PR #11, authored by obotclaw[bot]
Draft PR #11 (Closes
#7) builds the full documentation
site per the #21 design:
npm run site emits _site/ โ gallery of all nine renderers (histogram available,
eight planned), live histogram demo mounting the committed dist/ bundle, the
evidence page joining docs/histogram-coverage.md with evidence.json (95 records),
and the JSDoc-derived API reference. Relative URLs throughout so the same build works at
the site root, /dev/, and /pr/{N}/.
Red-Green TDD: failing site tests committed first, then 19 tests green (79 unit total,
16 browser). Link/screenshot validation is wired into CI and caught a real defect on its
first run (a repo-relative coverage-doc link). Playwright smoke loads gallery + demo from
_site/ with zero console errors.
Both open implementation calls from the design settled: hero screenshot =
SH-CTRL-001-control-panel.png (swappable in site/config.json); the sticky
preview-comment mechanism stays with #8.
Three of #21's four sub-issues are now done or in review; publishing (#8) is the
remainder โ pages.yml (root/dev/PR tiers), the one-time manual Pages setting, and
PR-preview comments.
Identity: agent-authored PRs now come from the obotclaw app
New rule (@jwildfire, today): agent-authored development work โ commits, branch
pushes, and drafted PRs, working sessions included โ is authored by obotclaw[bot]
via the obot GitHub App; @jwildfire is reserved for Jeremy acting himself (reviews,
sign-offs, merges). The bot authors work; it never approves or merges it.
safety.agent PR #10 updates the
obot-identity skill's actor table accordingly (open, awaiting review).
First PRs under the rule: safety.viz#11
and safety.agent#10 itself โ both show app/obotclaw as author.
Harness: session-lifecycle skills land in the hub
session-wrapup
committed (dc96c67): the end-of-session closing routine โ inventory, roadmap hygiene,
scaffold review, next-session list, diary post โ codified from the last week's manual
wrapups. This entry is its first run.
Kickoff + mid-session capture skills committed (a5bf9de): session-overview
(prioritized open-task list at session start), session-update / session-note
(running todo + note scratchpad the wrapup sweeps), session-checklist.
Background-session naming convention recorded to memory (kickoff sessions named
session overview YYYY-MM-DD, orange).
(Post-wrapup, same day)session-wrapup reworked on @jwildfire's feedback from
its first run: the routine is now collect โ discuss โ apply โ a read-only
evidence sweep (now including the day's agent session transcripts, which the
first run skipped) followed by an interactive checkpoint (findings + clarifying
questions) before any issue edits, stage moves, or diary post.
Gilead-BioStats gh API remains SAML-blocked โ
gsm.agent PR #33 (interactive
HTML review skill, opened 07-08) not verifiable from here; local clone is at v0.2.0.
Priorities re-set by @jwildfire post-wrapup (2026-07-09):
safety.viz docs โ v0.1 release: review/undraft/merge
PR #11 (โ dev, closes
#7); then publishing
(#8) โ pages.yml with
root/dev/pr/{N} tiers + close-cleanup, the one-time manual Pages setting
(source = gh-pages branch), sticky preview-comment mechanism; then the first
dev โ main release PR closing out milestone v0.1.0 โ the deployed histogram
site entry moves hub #2 (and
#21) toward Released per the
done-gate.
obot.roadmap v0.2 release: successor to
v0.1 "Roadmap hub established"
(2026-07-03) โ 30 commits since: designs + sign-offs for #1/#2/#3/#21, the obotclaw
app + autonomy grants, roadmap version badge + changelog, dashboard retirement,
session-lifecycle skills, diary 07-03 โ 07-09. Draft the release notes for
@jwildfire sign-off before tagging.
Roadmap cleanup: hygiene sweep of the hub โ requirement bodies/stages/milestones
across the board, plus the carried decisions: #3 ยง7 credential retirement, advance
#17/#18
(๐ + Q1โQ4), session-orchestration D1โD4; check gsm.agent PR #33 via the local
clone. Local workspace side (needs deletion approval): merged safety.viz worktrees
1-scaffold-library, 5-evidence-pipeline, 6-api-reference (clean) and
2-extract-histogram (untracked tmp-demo/ inside); keep 7-docs-site while
PR #11 is open.
Blog work (#22) โ fully
actionable, recon done 07-09: write post #5 from the expanded outline on
jwildfire.github.io branch draft/obot-v3-outline-update (extend draft PR #8; merge =
@jwildfire); series outline through the October keynote โ #22 Design section; big.blog
post/rpharma-keynote-diary-2-3 rebase onto moved origin/main + push via SSH, share
compare URL; then cross-post diary #4.
Also in flight:
safety.agent PR #10 (obotclaw
identity rule) awaits review/merge.