The release day. Everything the morning entry set up โ the eDISH
port at review, the RC1 spawn, the blog drafts โ converged by evening:
safety.viz v1.2.0 shipped (eDISH + a full 19-figure clinical guide),
R/Pharma diary #5 "Introducing safety.viz" published alongside it, and
gsm.safety v1.0.0 RC1 staged with qcthat qualification โ six widgets, six
workflows, 47 issue-linked tests โ then re-tasked to pull in the v1.2 renderer.
Five lanes ran across an orange lead, three green siblings, and one โก๏ธ job; the
original top-level requirement, hub
#1 (a consolidated
safety.viz library), closed today.
Work completed
safety.viz v1.2.0 โ released (hub #30, now Released)
eDISH landed: PR #44
finalized by the ๐ฏ edish sibling โ done-gate verified live in Chrome (155
evidence checks green), a tooltip float fix landed with zero evidence drift,
and the requirement matrix staged as
obot.agent PR #28 โ then
merged to dev.
Full clinical guide: PR #52
grew from a guide-section framework into a complete 38KB adaptation of the
DIA-ASA working group's eDISH workflow manual (19 figures, ported by a
dedicated ๐ฏ guide-port sibling; @jwildfire leads the owning WG, so direct
migration with attribution). The site gains a per-renderer Guide tab.
Release mechanics: matrix moved from tab to evidence-page link
(#56/PR #57,
reviewed and merged same-hour), gallery cards simplified, version swap
applied (v1.2 = hep-explorer, v1.3 = framework/tooling), RC cut as
PR #58 โ promotion
PR #59 โ
v1.2.0 tagged Latest
at 21:52 ET with functionality-first notes.
Blog โ diary #5 published (hub #22, now Development)
@jwildfire reordered the series (the safety.viz announcement jumps to #5) and
heavily rewrote the draft; the ๐ฏ blog sibling processed the rewrite through
fact-check and screenshot passes across four review-page revisions, then
published
_posts/2026-07-12-introducing-safety-viz.md
with the keynote page update once v1.2.0 was live. Posts #6/#7 (transition,
obot.agent case study) are renumbered with reframes queued.
gsm.safety v1.0.0 RC1 โ staged at the gate (hub #28, now Development)
The โก๏ธ๐ค RC1 job ran requirement-first: Design + Tasks posted to hub #28
before fan-out, sub-issues
gsm.safety #31โ38 filed,
then a 13-agent build (~760k tokens, verify round 6/6) delivered draft
PR #39: six Widget_*()
htmlwidgets on the vendored safety.viz bundle, six runnable
gsm.core::RunWorkflow workflows, ExampleData() on pharmaverseadam, the
legacy safetyCharts bridge fully retired, and qcthat 1.1.3 qualification
(47 issue-linked tests, devtools::check() 0/0/0).
Evening follow-ups on the same PR: CI workflow templates synced + qcthat.yaml
added, the pkgdown Examples dropdown restored with six live-widget pages, and
a root-cause WidgetSizingPolicy() fix (100%-width widgets in all contexts).
Evidence bundle live.
After v1.2.0 shipped, the job was re-tasked to sync the RC to safety.viz
v1.2.0 and add Widget_HepExplorer
(gsm.safety #40) โ the
refreshed evidence (7 widgets / 52 tests) was already on the hub at wrapup,
with the PR update in flight.
Scaffold + supervision
Lean bookends filed as
obot.agent #29 per
@jwildfire's feedback (init = carried list + cheap delta; wrapup = fold the
as-you-go scratchpad) โ this wrapup piloted the lean shape.
New โก๏ธ failure mode: the RC1 job froze 9 minutes on "Login expired"
mid-run; a terminal push + re-auth recovered it. The runbook memory now
carries an auth-freshness pre-flight and the attach โ /login recovery path.
The shipped v1.2.0 milestone still carries open issues (sv #45โ50,
#53โ55) from the version swap โ re-milestone before it reads as regression.
gsm.safety PR #39 keeps growing (v1.2 sync in flight) โ review it only after
gs#40 lands and CI is green on the final head.
โก๏ธ auth expiry is now a known stall mode for long background runs; the
pre-flight is in the runbook but untested.
big.blog syndication still trails the personal site (post #5 not cross-posted).
Next session: loose ends
Review/merge gate sweep โ gsm.safety
PR #39 after the gs#40
sync lands โ merge + tag the gsm.safety release; obot.agent
PR #24 /
PR #27 /
PR #28; reconcile
gsm.safety PR #29 against
the shipped widgets.
Roadmap reconciliation โ re-milestone sv #45โ50/#53โ55 off v1.2.0 and
close the milestone; close-out sign-offs hub #2/#3/#21; check hub
#32 against the
shipped clinical guide; Designs for hub
#31 /
#33.
Agent work โ implement lean bookends
(oa #29); land the
session-hub cluster + roadmap-prep; oa #15 stylesheet rider.
Verify the two lanes in flight at wrapup: the โก๏ธ RC1-update job (gs#40) and
the ๐ฏ blog cleanup/keynote job.
๐ ToDo
Review + merge gsm.safety PR #39
(post-sync) โ tag the release (notes drafted in the evidence bundle).